PERENCANAAN INSTALASI SISTEM PEMADAM SPRINKLER MENURUT STANDAR NFPA DAN SOLAS PADA KAPAL KELAS 1 KENAVIGASIAN DI PT. ORELA SHIPYARD

Rahma, Aulia Vigita (2017) PERENCANAAN INSTALASI SISTEM PEMADAM SPRINKLER MENURUT STANDAR NFPA DAN SOLAS PADA KAPAL KELAS 1 KENAVIGASIAN DI PT. ORELA SHIPYARD. Diploma thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.

Full text not available from this repository.

Abstract

ABSTRAK Kapal kelas 1 kenavigasian merupakan sebuah kapal navigasi. Kapal navigasi memiliki peran yang sangat penting antara lain menyiapkan rambu-rambu, alur pelayaran dan memberikan informasi yang jelas kepada setiap nahkoda yang sedang berlayar. Sama seperti dengan kapal lainnya untuk melindungi kapal dari potensi kebakaran, kapal kenavigasian juga dipasang sistem pemadam seperti sprinkler. Pada laporan tugas akhir ini, perencanaan instalasi sistem pemadam sprinkler akan menggunakan standar Safety of Life at Sea (SOLAS) dan National Fire Protection Association (NFPA) yang mana nanti akan dihitung jumlah sprinkler yang diperlukan. Perhitungan-perhitungan akan dilakukan untuk mendapatkan panjang pipa, pipe fittings dan daya pompa. Berdasarkan perhitungan-perhitungan yang telah dilakukan, diketahui jumlah sprinkler yang dibutuhkan sebanyak 26 buah. Pompa yang dipilih yaitu pompa yang memiliki daya sebesar 7,2 kW. Pipa utama sistem pemadam memiliki panjang total 17,3m dengan menggunakan pipa berstandar ASME B36.10M dengan diameter 5” Sch. 40. Panjang total pipa cabang sepanjang 93m dengan menggunakan pipa berstandar ASTM A795 dengan diameter 2½“ Sch. 10. Elbow 5” sebanyak 5 buah, Elbow 2½“ sebanyak 6 buah, Tee 2½“ sebanyak 5 buah, Tee 5" x 2 ½” x 2 ½” sebanyak 1 buah, Tee 5" x 5" x 2 ½” sebanyak 2 buah, Tee 2 ½” x 2 ½” x 2 ½” sebanyak 5 buah, Reducer 5” x 2½“ sebanyak 3 buah dan drop nipple sebanyak 26 buah. Valve yang digunakan adalah butterfly valve sebanyak 2 buah dan angle valve sebanyak 4 buah. Kata Kunci : Debit, head total, navigasi, Sprinkler, SOLAS, NFPA,. ABSTRAK 1st class navigation ship is a navigation ship. Navigation ship has such important role like prepare the traffic at sea, the groove of cruise and gives information to captains in sailing. Just like another ships, to protecting from fire potential, this navigation ship will be installated by fire fighting system like sprinkler. At this final project report, installation plan of sprinkler fire fighting will use standard Safety of Life at Sea (SOLAS) and National Fire Protection Association (NFPA). Then will be count the total of the sprinkler. Beside of the total of the sprinkler, there will be count how long the pipe, the total of pipe fittings that need for and the power of pump. Based on the calcuation, total of the sprinkler that needs for are 26 piece s. The choosen pump is a pump that has 7,2 kW. The main pipe of this fire fighting has 17,3m long which use pipe standard ASME B36.10 with 5” diameter and use schedule 40. The total of branch pipe is 93m long using pipe standard ASTM A795 with 2½” schedule 10. Elbow 5” diameter need 5 pieces, Elbow 2½“ diameter need 6 pieces, Tee 2½“ diameter need 5 pieces, Tee 5" x 2 ½” x 2 ½” need 1 pieces, Tee 5" x 5" x 2 ½” need 2 pieces, Tee 2 ½” x 2 ½” x 2 ½” need 5 pieces, Reducer 5” x 2½“ need 3 pieces dan drop nipple need 26 pieces. There are 2 valves will be used for. Butterfly valve need 2 pieces and angle valves need 4 pieces. Keywords : Navigation, sprinkler, SOLAS, NFPA, total head.

Item Type: Thesis (Diploma)
Subjects: T Technology > T Technology (General)
Divisions: Jurusan Teknik Permesinan Kapal > D3 Teknik Permesinan Kapal
Depositing User: Unnamed user with email repository@ppns.ac.id
Date Deposited: 19 Sep 2018 06:29
Last Modified: 19 Sep 2018 06:29
URI: http://repository.ppns.ac.id/id/eprint/958

Actions (login required)

View Item View Item