Wahyuningtyas, Wahyuningtyas (2017) ANALISA PERBANDINGAN KEBUTUHAN ELEKTRODA SECARA PERENCANAAN DENGAN PELAKSANAAN DI LAPANGAN UNTUK PEMASANGAN KONSTRUKSI PADA BLOK MD6 DAN TD6 KAPAL PERINTIS 2000 GT DI PT. JANATA MARINA INDAH SEMARANG. Diploma thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.
Full text not available from this repository.Abstract
ABSTRAK Aktivitas penyambungan block-block kapal tidak lepas dari aktivitas pengelasan. Profesi tukang las/welder memegang peranan penting dalam proses pengelasan. Seorang welder sangat menentukan dalam progress project, cost, dan time delivery kapal yang dikerjakan. Proses pengelasan untuk pemasangan konstruksi pada block-block kapal menggunakan teknik pengelasan SMAW (Shielded Metal Arc Welding) dan FCAW (Flux Core Arc Welding). Proses pengelasan SMAW dan FCAW menggunakan panas dari arus listrik untuk melelehkan material dasar dan elektroda. Elektroda adalah material yang sekali pakai dan tidak bisa diperbaiki pada pengelasan. Pada Tugas Akhir ini akan membandingkan hasil kebutuhan elektroda dan nilai ekonomis melalui perhitungan perencanaan dengan pelaksanaan di lapangan untuk pemasangan konstruksi pada block TD6 dan block MD6 Kapal Perintis 2000 GT. Hasil dari analisa perbandingan didapatkan perbedaan kebutuhan elektroda dan nilai ekonomis antara perencanaan dengan pelaksanaan di lapangan. Secara perencanaan Kebutuhan elektroda untuk pemasangan konstruksi pada block TD6 dan block MD6 untuk pengelasan SMAW adalah 1048,98 Kg, biaya pengelasan Rp. 22.395.127,-, besarnya konsumsi elektroda 0,299 Kg/meter, dan kecepatan Pengelasan 6,3 meter/jam. untuk pengelasan FCAW adalah 913,01 Kg, biaya pengelasan Rp. 22.443.478,-, besarnya konsumsi elektroda 0,66 Kg/meter, dan kecepatan Pengelasan 7,3 meter/jam.. Sedangkan dalam pelaksanaannya di lapangan kebutuhan elektroda untuk pengelasan SMAW adalah 1178,73 Kg, biaya pengelasan Rp. 25.456.913,-, besarnya konsumsi elektroda 0,292 Kg/meter, dan kecepatan Pengelasan 6,14 meter/jam.. Dan untuk pengelasan FCAW adalah 1030,48 Kg, biaya pengelasan Rp. 25.367.825,-, besarnya konsumsi elektroda 0,64 Kg/meter, dan kecepatan Pengelasan 7,1 meter/jam. Secara ekonomis biaya pengelasan dan efisiensi pemakaian elektroda proses FCAW lebih ekonomis dibandingkan dengan proses SMAW, dan untuk pencapaian target produksi pengelasan FCAW lebih cepat dibandingkan dengan SMAW. Kata Kunci : Block, SMAW, FCAW, Elektroda, Cost. ABSTRACT Block-block splicing activity can not be separated from welding activity. The welder's profession plays an important role in the welding process. A welder is decisive in the progress project, cost, and time delivery of the ship being worked on. Welding process for the installation of construction on ship blocks using the technique of welding SMAW (Shielded Metal Arc Welding) and FCAW (Flux Core Arc Welding). The SMAW and FCAW welding processes use heat from an electric current to melt the base material and electrode. Electrodes are disposable and irreversible materials in welding. In this Final Project will compare the results of electrode needs and economic value through the calculation of planning with the implementation in the field for the installation of the construction on the block TD6 and block MD6 of 2000 GT Pioneer Ships. The result of comparison analysis shows the difference of electrode requirement and economic value between planning and implementation in the field. Planning Electrode requirement for construction installation on the block TD6 and block MD6 for SMAW welding is 1048,98 Kg, welding cost Rp. 22.395.127, -, the consumption of electrode 0.299 Kg / meter, and welding speed 6.3 meters / hour. For FCAW welding is 913.01 Kg, welding cost Rp. 22.443.478, -, the consumption of electrode 0.66 Kg / meter, and the speed of welding 7.3 meters / hour. While in the field of electrode needs for welding SMAW is 1178.73 Kg, welding costs Rp. 25.456.913, -, the consumption of electrode 0.292 Kg / meter, and welding speed 6.14 meters / hour. And for welding FCAW is 1030.48 Kg, welding costs Rp. 25.367.825, -, the amount of electrode consumption 0.64 Kg / meter, and welding speed 7.1 meters / hour. Economically, welding cost and efficiency of FCAW process electrode usage is more economical compared to SMAW process, and for achieving FCAW welding production target faster than SMAW. Keywords: Block, SMAW, FCAW, Electrode, Cost.
Item Type: | Thesis (Diploma) |
---|---|
Subjects: | T Technology > T Technology (General) |
Divisions: | Jurusan Teknik Bangunan Kapal > D4 Teknik Perancangan dan Kontruksi Kapal |
Depositing User: | Unnamed user with email repository@ppns.ac.id |
Date Deposited: | 19 Sep 2018 03:17 |
Last Modified: | 19 Sep 2018 03:17 |
URI: | http://repository.ppns.ac.id/id/eprint/918 |
Actions (login required)
View Item |