Anam, Khoirul (2017) PERENCANAAN KEBUTUHAN DAN ESTIMASI BIAYA PELUNCURAN PADA KAPAL TANKER 17500 DWT DENGAN MENGGUNAKAN AIR BAGS. Diploma thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.
Full text not available from this repository.Abstract
ABSTRAK Penulisan Tugas akhir ini bertujuan untuk merencanakan kebutuhan dan estimasi biaya peluncuran pada kapal tanker 17500 DWT dengan menggunakan air bags. Adapun yang menjadi latar belakang dari penulisan tugas akhir ini berdasarkan tempat magang kerja yaitu pada PT. LMI, yang merupakan perusahaan galangan kapal dalam proses peluncurannya menggunakan metode air bags. Dalam perhitungan yang berhubungan air bags tidak terlepas dari regulasi shipbuilding industry standart (PRC), pada perhitungan yang dilakukan meliputi jumlah, jarak serta kapasitas air bags yang digunakan dalam objek penelitian ini yaitu kapal tanker 17500 DWT. Sedangkan dalam perhitungan estimasi biaya kebutuhan, peneliti menghitung estimasi biaya material dan estimasi biaya kerja. Perhitungan estimasi biaya material dapat ditelusuri informasi yang ada, namun dalam perhitungan estimasi biaya tenaga kerja dapat ditentukan dengan mencari informasi yang berkaitan dengan waktu yang diperlukan dalam menyelesaikan suatu pekerjaan, jumlah tenaga kerja yang dibutuhkan, jumlah jam orang serta gaji umk perdaerah. Hasil penelitian menunjukan bahwa kebutuhan peluncuran kapal tanker 17500 dwt berjumlah 38 air bags berjarak 3,75 m dengan kapasitas 188,3988 kN/m , winch 60 ton, wire rope berdiameter 64 mm dengan estimasi jumlah tenaga kerja 80 orang serta membutuhkan waktu 3376 jam orang. Sedangkan estimasi biaya peluncuran mencapai Rp. 5.674.882.948,55 Kata kunci : Peluncuran, air bag, estimasi biaya ABSTRACT The writing of the final project aims to plan a needs and estimation of the cost of the launch on the tanker with water either using a DWT 17500 bags. As for who becomes the backdrop of this final task of writing based on the place of internship working in pt. LMI, which is in the process of shipbuilding company of launch method using air bags. In the calculation of the related air bags is inseparable from the industry standard shipbuilding regulation (PRC), in the calculation that is done includes the amount of distance, as well as the capacity of the air bags used in the research object of tanker DWT 17500. Whereas in the calculation of the estimated cost requirements, researchers calculate the estimated cost of material and labor cost estimation. Calculation of the estimated cost of materials can be traced to the information there, but in the calculation of the estimated labor cost can be determined by looking for information related to the time it takes to complete a job, the amount of labor needed, number of hours and the salary of the umk each area. The research results showed that the tanker launch needs 17500 dwt totaled 38 air bags is 3.75 m with capacity 188.3988 kN/m, 60-ton winch, wire rope diameter 64 mm with estimated the number of people 80 and the labor takes hours of 3376 people. While the estimated cost of the launch reached Rp. 5,674,882,948.55 Keywords: launch, air bag, cost estimation
Item Type: | Thesis (Diploma) |
---|---|
Subjects: | T Technology > T Technology (General) |
Divisions: | Jurusan Teknik Bangunan Kapal > D4 Teknik Perancangan dan Kontruksi Kapal |
Depositing User: | Unnamed user with email repository@ppns.ac.id |
Date Deposited: | 18 Sep 2018 06:01 |
Last Modified: | 18 Sep 2018 06:01 |
URI: | http://repository.ppns.ac.id/id/eprint/886 |
Actions (login required)
View Item |