ANALISIS RISIKO PEKERJAAN DI KETINGGIAN MENGGUNAKAN METODE HIRARC DENGAN PENENTUAN RISK RANKING MENGGUNAKAN FUZZY LOGIC CONTROL

Kesauliya, Olivia Marie Caesaria (2016) ANALISIS RISIKO PEKERJAAN DI KETINGGIAN MENGGUNAKAN METODE HIRARC DENGAN PENENTUAN RISK RANKING MENGGUNAKAN FUZZY LOGIC CONTROL. Diploma thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.

Full text not available from this repository.

Abstract

ABSTRAK PT. SASMITO merupakan perusahaan swasta yang bergerak di bidang konstruksi. Salah satu proyek yang dikerjakan PT.SASMITO adalah pembangunan gedung Common Support Lab TeknikIndustri – ITS yang bertingkat 7 lantai. Semakin tinggi bangunan, maka tingkat kemungkinan terjadi kecelakaan kerja semakin tinggi sehingga diperlukan suatu manajemen yang baik mengenai Keselamatan dan Kesehatan Kerja (K3). Pada PT.SASMITO belum terdapat penilaian risiko terhadap pekerjaan di ketinggian sehingga dalam penelitian ini dilakukan identifikasi bahaya yang terdapat padape kerjaan di ketinggian untuk mengetahui penyebab dan dampak risiko yang mungkin terjadi serta melakukan penilaian risiko sehingga penulis dapat menentukan solusi yang tepat pada setiap langkah pekerjaan agar tidak terjad ikecelakaan. Pada penelitian ini identifikasi bahaya setiap jenis pekerjaan pada ketinggian dilakukan secara detail menggunakan metode HIRARC, sedangkan dalam menentukan level risiko menggunakan fuzzy logic control di mana dalam pembuatan rule base nya berdasarkan pada peraturan AS/NZS 4360:2004. Selain aspek penentuan level resiko, juga dilakukan pemberian nilai likelihood dan severity yang berdasarkan pertimbangan dari pihak perusahaan dan mengacu pada peraturan AS/NZS 4360:2004. Dari hasil penelitian ini diperoleh 5 potensi bahaya yang memiliki level risiko very high, 27 potensi bahaya yang memiliki level risiko high, dan 2 potensi bahaya yang memiliki level risiko medium. Pada tahap terakhir, pemberian solusi hanya diberikan pada 5 potensi bahaya yang memilik level risiko very high yakni dengan melakukan pengecekan scaffolding sebelum digunakan, membuat SOP pemasangan scaffolding, memberikan training tentang bekerja di ketinggian, melakukan briefing sebelum bekerja, menggunakan APD, pengaturan shift kerja, memberikan sanksi apabila tidak menggunakan APD dan pembuatan safety net. Kata kunci :HIRARC (Hazard Identification, Risk Analysis and Risk Control), Fuzzy logic control, The Standards Australia New Zealand, 4360 : 2004 dan jenis pekerjaan di ketinggian. ABSTRACT PT.SASMITO is one of confidential companies that elaborates in construction scope. One of its projects is 7 storey building named common support lab of industrial engineer in ITS. The higher it takes in height, the more possibility of work accidents could happen, so that we need such a good management of Occupational Health and Safety (K3). Due to the fact that in PT.SASMITO has no risk assessment for working at height, the purpose of this research is to identify the hazard of working at height particularly finding the cause and the impact that might be happened and also to conduct the risk assessment so that here the writer could adjudicate the proper solution in order to avoiding the accident in every way of working. On this research, the hazard identification in every kind of working at height conducted in detail by HIRARC method whilst in determining the risk level is using fuzzy logic control which in the manufacture of rule base is according to regulation AS/NZS 4360 ; 2004. In addition to risk level assessment aspect, another aspect also conduct in granting value of likelihood and severity based on consideration by the company itself and in reference to regulation AS/NZS 4360:2004. From this research, obtained 5 very high-risk ranking of hazard potentials, 27 high-risk ranking of hazard potentials, and 2 medium- risk ranking of hazard potentials. In the last phase, the solutions are only imparted to the 5 very high risk ranking of hazard potentials type by checking the scaffolding before it is used, creating SOP for the scaffolding installation, providing the working at height training, conducting a briefing before the work starts, using APD, arranging the work shift-time, giving sanction for the worker who do not use the APD, and manufacturing the safety net. Keywords: HIRARC (Hazard Identification, Risk Analysis and Risk Control), Fuzzy logic control, The Standards Australia New Zealand, 4360: 2004 and the type of work at height.

Item Type: Thesis (Diploma)
Subjects: T Technology > T Technology (General)
Divisions: ?? tkdkk ??
Depositing User: Unnamed user with email repository@ppns.ac.id
Date Deposited: 14 Sep 2018 02:09
Last Modified: 14 Sep 2018 02:09
URI: http://repository.ppns.ac.id/id/eprint/660

Actions (login required)

View Item View Item