EVALUASI TEKNIS UNTUK PERANCANGAN ULANG DIMENSI BAK PENGOLAH AIR LIMBAH INDUSTRI DI WASTE WATER TREATMENT PLANT (STUDI KASUS: PT. PETRO JORDAN ABADI)

Putri, Marsha Savira Agatha (2016) EVALUASI TEKNIS UNTUK PERANCANGAN ULANG DIMENSI BAK PENGOLAH AIR LIMBAH INDUSTRI DI WASTE WATER TREATMENT PLANT (STUDI KASUS: PT. PETRO JORDAN ABADI). Diploma thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.

Full text not available from this repository.

Abstract

ABSTRAK PT. Petro Jordan Abadi merupakan perusahaan yang bergerak di bidang manufaktur kimia yang memproduksi Asam Fosfat. Limbah produksi semakin meningkat, dengan demikian hal ini menimbulkan oversludge yang disebabkan oleh ketidaksesuaian penginjeksian bahan kimia ke dalam bak pengolah maupun debit aliran air limbah yang meluap dengan karakteristik yang belum memenuhi standart baku mutu yang ditetapkan oleh Peraturan Gubernur Jawa Timur Nomor 72 Tahun 2013. Dengan demikian perlu dilakukan evaluasi mengenai karakteristik dan dampak yang ditimbulkan, dimensi unit pengolahan yang disesuaikan dengan kriteria desain, dan kebutuhan bahan kimia flokulan maupun koagulan. Analisis dampak yang ditimbulkan oleh air limbah industri yang overflow, dilakukan dengan metode pengujian karakteristik air limbah di Laboratorium PT. Petro Jordan Abadi. Evaluasi bak pengolah air limbah dilakukan dengan perhitungan spesifikasi masing-masing bak dan dibandingkan dengan kriteria desain menurut Metcalf&Eddy. Kemudian, merencanakan spesifikasi masing-masing bak dan melakukan perhitungan ulang untuk memastikan bahwa perancangan yang baru telah memenuhi kriteria desain. Selain itu, juga menentukan alternatif bahan koagulan maupun flokulan yang diinjeksikan pada Primary Section dengan hasil jar test. Evaluasi kebutuhan koagulan dan flokulan dilakukan dengan cara membandingkan kebutuhan bahan tersebut untuk debit untuk perancangan lama dengan perancangan baru. Berdasarkan hasil pengerjaan dari metode diatas, karakteristik limbah yang mengalami overflow pada TK-6601 masih belum memenuhi baku mutu dan menimbulkan dampak terhadap lingkungan. Hal ini dikarenakan semua unit pengolah belum memenuhi kriteria desain. Sehingga, perlu dilakukan pembesaran dan pengurangan ukuran dimensi. Dimensi bak yang diperbesar antara lain; Bak Ekualisasi I, serta Bak Flokulasi I dan II. Sedangkan dimensi bak yang diperkecil antara lain; pada seluruh Unit Koagulasi dan Sedimentasi, serta Bak Ekualisasi II dan III. Kebutuhan Lime Milk 5604,4 kg/hari, Alum 1204,7 kg/hari, Polimer 32,5 kg/hari, NaOH 0,9 m 3 /hari. Kata Kunci: Overflow, Oversludge, Evaluasi, Redesign, Wastewater Treatment Plant ABSTRACT PT. Petro Jordan Abadi is the chemcial manufacturing company which produces Phosporic Acid. It waste production is increasing which are caused by mismatches injection both of coagulant and floculant into wastewater treatment unit and also the stream flow of wastewater was overflowing which that characteristics had not fulfill regulation standard were set by PerGub Jatim No. 72 Tahun 2013. Therefore, it was important to evaluate the waste water characteristics and impacts, the dimensions of the processing unit was adapted to design criteria, and the need for flocculants and coagulants. This study did both sampling test analyzed the impact of the industrial waste water overflow and jartest methods to evaluated best of the coagulant and flocculant requirement wastewater treatment. The evaluation of wastewater treatment units are done by calculating the specifications of each unit, and compared with the design criteria according to Metcalf & Eddy. After that, redesign of wastewater unit dimensions are planned by recalculated at least the design criteria fulfilled. The results of this study showed that the overflowing wastewater characteristics on TK-6601 had not met the regulation standards and impacts for the environment, due to all the processing units had not meet the design criteria. Thus, the units need to be enlarged or reduced this dimensions. The enlarged dimension of wastewater unit among others; 1st Equalization Unit, also both of First and Second Floculation Unit. While the reduced dimension among others; all of the Coagulation and Sedimentation Unit also both of First and Second Equalization Unit. The need for Lime Milk is 5604,4 kg/day, Alum 1204,7 kg/day, Polymer 32,5 kg/day, and caustic soda 0,9 m 3 /day. Keywords: Redesign, Wastewater Treatment Plant

Item Type: Thesis (Diploma)
Subjects: T Technology > T Technology (General)
Divisions: ?? tkdkk ??
Depositing User: Unnamed user with email repository@ppns.ac.id
Date Deposited: 13 Sep 2018 03:47
Last Modified: 13 Sep 2018 03:47
URI: http://repository.ppns.ac.id/id/eprint/603

Actions (login required)

View Item View Item