ANALISIS EFEKTIVITAS PADA MESIN FLANGING DENGAN METODE OEE DAN PENYEBAB KEGAGALAN MESIN DENGAN SEVEN WASTE METHOD

Kusumantoro, Dharmo Maliki (2016) ANALISIS EFEKTIVITAS PADA MESIN FLANGING DENGAN METODE OEE DAN PENYEBAB KEGAGALAN MESIN DENGAN SEVEN WASTE METHOD. Diploma thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.

Full text not available from this repository.

Abstract

ABSTRAK PT. Boma Bisma Indra adalah salah satu perusahaan fabrikasi dan kontraktor di Indonesia yang memproduksi berbagai macam kebutuhan akan komponen -komponen industri dari permintaan perusahaan industri lain. Sebagian besar proyek yang diker jakan oleh PT. Boma Bisma Indra adalah Pressure Vessel, Heat Exchanger, Plate Condenser, Piping Work, Heavy Steel Structure, Erected Tank, Machining & Part, Mollen Roll, Brake drum, casting dan lain sebagainya. Untuk menunjang produktivitas, mesin-mesin produksi khususnya mesin flanging harus senantiasa berada dalam kondisi baik dan memiliki efektivitas yang tinggi untuk meningkatkan produktivitas perusahaan. Penelitian ini bertujuan untuk mengukur nilai efektivitas mesin flanging dengan metode Overall Equipment Effectiveness (OEE) dan metode Failure Mode and Effect Analysis (FMEA) untuk dicari waste yang kritis untuk dilakukan perbaikan. Dalam pengukuran OEE terdapat tiga faktor penting yang mempengaruhi, yakni availability rate, performance rate, dan quality rate yang masing-masing standar global adalah berturut-turut 90%, 95% dan 99%, sedangkan untuk standar global nilai OEE adalah 85%. Data yang digunakan adalah data Bulan Januari-Desember 2015, selama periode tersebut diperoleh nilai Overall Equipment Effectiveness (OEE) sebesar 78,70% dan hasil availability rate sebesar 99,21%, hasil performance rate sebesar 79,42% dan hasil quality rate sebesar 99,88%. Nilai OEE tertinggi adalah pada bulan Mei 2015 sebesar 81,23% dan terendah pada bulan November 2015 sebesar 76,75%. Hasil efektivitas dipengaruhi waste yang dominan adalah waiting, inventory dan motion. Perbaikan yang direkomendasikan adalah melakukan standarisasi suppliers pada waste jenis waiting, memberi pelatihan wawasan preventive maintenance untuk operator pada waste jenis motion dan memasang canopy baja ringan untuk penyimpanan material yang berada di luar perusahaan pada waste jenis inventory. Kata Kunci : Failure Mode and Effect Analysis (FMEA), Overall Equipment Effectiveness (OEE), Waste ABSTRACT PT. Boma Bisma Indra is one of fabrication and contractors company in Indonesia which produce a wide range of needs of industrial components from other industrial companies demand. Most of the projects undertaken by PT. Bo ma Bisma Indra is the Pressure Vessel, Heat Exchangers, Plate Condenser, Piping Work, Heavy Steel Structure, erected Tank, Machining & Parts, Mollen Roll, Brake drum, casting and so forth. To support the productivity, production machines, especially flangi ng machine must always be in good condition and has a high effectiveness to improve the productivity of the company. This study aims to measure the effectiveness of the value of flanging machine with methods of Overall Equipment Effectiveness (OEE) and FMEA method to look for waste that is critical to do repairs. In OEE measurement, there are three important factors that affect, the availability rate, performance rate and quality rate each global standard is respectively 90%, 95% and 99%, while the global standard OEE value is 85%. The data used is the month from January to December 2015, during the period that the value overall equipment effectiveness (OEE) of 78.70% and results availability rate of 99.21%, results of performance rate of 79.42% and quality rate of 99.88%. OEE value is the highest in May 2015 amounted to 81.23% and the lowest in November 2015 amounted to 76.75%. Effectiveness results influenced the dominant waste is waiting, inventory and motion. Recommended improvements is to standardize sup pliers on waste type of waiting, gave training about an insight of preventive maintenance for operators on waste type of motion and install light steel canopy for storage of materials that are in outside of company on waste type of inventory. Key Word : Failure Mode and Effect Analysis (FMEA), Overall Equipment Effectiveness (OEE), Waste

Item Type: Thesis (Diploma)
Subjects: T Technology > T Technology (General)
Divisions: ?? tddm ??
Depositing User: Unnamed user with email repository@ppns.ac.id
Date Deposited: 12 Sep 2018 06:52
Last Modified: 12 Sep 2018 06:52
URI: http://repository.ppns.ac.id/id/eprint/573

Actions (login required)

View Item View Item