ANALISIS TRIP SETTING PADA KASUS ARUS TIDAK SEIMBANG DI UNIT KERJA PHONSKA 4 PT. PETROKIMIA GRESIK

Agustian, M. Robby (2015) ANALISIS TRIP SETTING PADA KASUS ARUS TIDAK SEIMBANG DI UNIT KERJA PHONSKA 4 PT. PETROKIMIA GRESIK. Diploma thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.

Full text not available from this repository.

Abstract

ABSTRAK Unbalance adalah kondisi tidak seimbang. Unbalance arus adalah kondisi arus yang tidak seimbang antar fasa pada suatu jaringan listrik. Kondisi unbalance lebih sering disebabkan oleh variasi dari beban. Ketika beban satu phase dengan phase lain berbeda, maka saat itulah kondisi unbalance terjadi. Hal ini mungkin disebabkan oleh impedansi, tipe beban, atau jumlah beban berbeda satu phase dengan phase lain. Akibat dari unbalance bisa menyebabkan kerusakan pada suatu beban ( winding motor atau tranformator terbakar, putus satu fase, dan short) apabila terjadi dalam waktu yang lama. Sehingga diperlukan proteksi untuk mengamankan beban dari arus yang tidak seimbang. Setting trip unbalance pada suatu proteksi diperlukan waktu yang tepat, jika setting trip unbalance diatur dengan waktu yang terlalu pendek, maka listrik akan sering trip sehingga unit kerja akan menambah jam breakdown akibat pemadaman listrik. Namun jika trip setting diatur dengan waktu yang terlalu lama, maka yang terjadi adalah kerusakan pada suatu beban. Setting trip pada unit phonska 4 menggunakan relay SEPAM 1000+. SEPAM ( System Electronic Protection Automation Measurement). Unit kerja phonska IV menggunakan SEPAM seri S untuk switch gear, seri T untuk tranformator, seri M untuk motor. Kata kunci : motor, relay SEPAM, setting trip unbalance, kontinuitas pelayanan. ABSTRACT Unbalance is unbalanced condition. Unbalance current is the current condition of unbalanced between phases in an electrical network. Unbalance condition is more often caused by variations of the load. When the load is a different phase with another phase, then that's when unbalance condition occurs. This may be caused by impedance, type of load, or the amount of load different from one phase to another phase. As a result of unbalance can cause damage to a load (a motor or transformer winding burning, breaking a single phase, and short) in the event in a long time. So that the necessary protection to secure the load from the current unbalanced. Setting unbalance trip at an appropriate time protection is required, if the setting is set to unbalance trip time is too short, then the trip so the electricity will often work unit will add hour breakdown due to power outages. But if the trip setting is set too long, then there is damage to a load. Setting trip on Phonska unit 4 using a relay SEPAM 1000+. SEPAM (Electronic Protection System Automation Measurement). Phonska work unit IV using SEPAM series S to switch gear, series T for transformer, series M to the motor. Keywords: motors, relays SEPAM, setting unbalance trip, continuity of service.

Item Type: Thesis (Diploma)
Subjects: T Technology > T Technology (General)
Divisions: Jurusan Teknik Kelistrikan Kapal > D3 Teknik Kelistrikan Kapal
Depositing User: Unnamed user with email repository@ppns.ac.id
Date Deposited: 30 Aug 2018 02:37
Last Modified: 30 Aug 2018 02:37
URI: http://repository.ppns.ac.id/id/eprint/255