ANALISIS RISIKO PADA SCRUBBER VESSEL AREA PHOSPHAT 1 DI PT. PETROKIMIA GRESIK MENGGUNAKAN METODE RISK BASED INSPECTION (RBI)

Teguh, Wahyudi (2015) ANALISIS RISIKO PADA SCRUBBER VESSEL AREA PHOSPHAT 1 DI PT. PETROKIMIA GRESIK MENGGUNAKAN METODE RISK BASED INSPECTION (RBI). Diploma thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.

Full text not available from this repository.

Abstract

ABSTRAK Kegiatan industri kimia di Petrokimia Gresik melibatkan jaringan scrubber untuk mengolah fluida. Oleh karena itu keandalan sistem scrubber sangat diperlukan pada setiap industri proses. Salah satu kegiatan untuk mempertahankan kehandalan sistem scrubber vessel adalah dengan menggunakan progam inspeksi yang berbasis Risk Based Inspection (RBI). API RBI 581 merupakan salah satu metode pengambilan keputusan untuk melakukan pengambilan analisis level risiko. Program inspeksi pada pressure vessel ini, bertujuan untuk menyusun program interval inspeksi dan tipe inspeksi nya. Interval inspeksi RBI ditentukan dengan menggunakan remaining life dan batasan waktu inspeksi berdasarkan API RP 510 pressure vessel inspection. Penelitian ini menganalisis level risiko kegagalan pada scrubber vessel. Dari hasil analisis RBI terhadap ketiga scrubber area Phosphat 1 mempunyai nilai probabilitas untuk thinning 2, dengan nilai penyebab kegagalan (damage factor thinning) 0,00009 failure/years. Konsekuensi area beracun tergolong “E” yaitu mencapai 82.483,78 ft 2 . Jadi risiko tergolong 2E yaitu menengah tinggi. Level risiko tersebut akan menjadi dasar pengambilan program inspeksi. Maka penentuan inspeksi yang mengacu pada API 510 2006, analisa remaining life menghasilkan inspeksi pada D-301 untuk shell dan head mempunyai interval inspeksi yang sama, untuk internal dapat dilakukan 10 tahun dari pemeriksaan terakhir, sedangkan secara eksternal dapat dilakukan 5 tahun dari pemeriksaan terakhir. Pada scrubber D-302 untuk shell dapat dilakukan 1,5 tahun kemudian dan head 10 tahun, untuk pemeriksaan secara eksternal untuk shell 1 tahun dan head bisa dilakukan 5 tahun. Sedangkan pada D-303 inspeksi secara internal pada shell dilakukan 2,6 tahun pada head 3,5 tahun, sedangkan pemeriksaan secara eksternal dapat dilakukan 1,5 tahun dari pemeriksaan terakhir. Kata Kunci: Program Inspeksi, Pressure Vessel, Risk Based Inspection (RBI), Risiko ABSTRACT The activities of the chemical industry in Gresik Petrochemical network involving the scrubber to process fluid. It is therefore very necessary scrubber system reliability on any industrial process. One of the activities to maintain the reliability of a system scrubber vessel inspection program is to use us-based Risk Based Inspection (RBI). The API RBI 581 is one method of decision-making for resolving risk level analysis. Pressure vessel inspection program on this, aiming to draw up a program of inspection interval and type of inspection. Inspection interval RBI specified using the remaining life time restrictions and inspections based on API RP 510 pressure vessel inspection This research analyzes the level of risk of failure on the scrubber vessel. From the results of the analysis of the third RBI against scrubber Phosphat area 1 has the value of the probability for the value 2, with thinning causes failures (damage factor thinning) 0,00009 failure/years. The consequences of toxic area belongs to the "E" that reaches 82.483,78 ft2. So the risk pertained 2E namely medium high. The risk level will be a basic retrieval program inspection. The inspection which refers to the API 510 2006 analysis of remaining life producing inspection on D-301 to the shell and head have the same inspection intervals, internal to be done 10 years of the last inspection, while externally can be done 5 years of the last inspection. On the scrubber D-302 to the shell can be made 1,5 years later and head for 10 years, externally to the shell head 1 year and 5 years can do. While in D-303 inspections internally at shell carried 2.6 years at head 3.5 years, while inspection can be done externally 1.5 years from the last inspection. Keywords: Program Inspection, Pressure Vessel, Risk Based Inspection (RBI), Risk

Item Type: Thesis (Diploma)
Subjects: T Technology > T Technology (General)
Divisions: ?? tkdkk ??
Depositing User: Unnamed user with email repository@ppns.ac.id
Date Deposited: 28 Aug 2018 03:33
Last Modified: 28 Aug 2018 03:33
URI: http://repository.ppns.ac.id/id/eprint/184

Actions (login required)

View Item View Item