PERENCANAAN AWAL MATERIAL RECOVERY FACILITY (MRF) DI PT. X

Umi Khoiriyah, Rohmawati (2015) PERENCANAAN AWAL MATERIAL RECOVERY FACILITY (MRF) DI PT. X. Diploma thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.

Full text not available from this repository.

Abstract

ABSTRAK PT.X merupakan industri yang bergerak dalam pembangunan kapal dengan perkiraan jumlah karyawan tahun 2020 mencapai 3792 orang, industri ini setiap harinya menghasilkan sampah B3 dan sampah non B3 (sampah sejenis rumah tangga) namun pada saat ini PT.X hanya melakukan pengelolaan sampah B3 saja, sedangkan sampah non B3 hanya ditampung dan dibuang secara keseluruhan ke Tempat Pemrosesan Akhir (TPA) tanpa dilakukan pengelolaan. Pasal 13 ayat 3 UU No.18 tahun 2012 tentang pengelolaan sampah dijelaskan bahwa pengelolaan kawasan industri dalam melakukan pemilahan sampah wajib menyediakan sarana pemilahan sampah skala kawasan . Tujuan penelitian ini yakni perencanaan Material Recovery Facility (MRF) sebagai salah satu unit pengolah sampah untuk mereduksi sampah non B3 di PT.X. Metode sampling sampah didasarkan pada SNI 19-3964-1995 tentang pengambilan dan pengukuran contoh timbulan dan komposisi sampah. Penentuan profil ini dibantu dengan menggunakan softwere SAP 2000. Hasil penelitian menunjukkan jumlah sampah yang dihasilkan sebesar 131,5 kg/hari, dengan komposisi 5,2 kg/hari sampah basah dapat dijadikan kompos. Sampah kering yang dapat dijual sebesar 126,3 kg/hari dan residu sebesar 9,0 kg/hari. Hasil tersebut menunjukkan bahwa Lahan Pembuangan Sementara (LPS) layak dikembangkan sebagai MRF dan bangunan MRF. PT.X membutuhkan lahan seluas 155 m2 dengan kelengkapan komponen fisik yang meliputi tempat pemilahan sampah kering, gudang penyimpan barang sortir, tempat pencacahan, tempat pengomposan, lahan pengayakan, tempat penyimpan kompos, tempat penampungan residu, kantor, basecamp staff dan area parkir gerobak. Proses operasional MRF PT.X akan diatur sesuai dengan Standart Operasional Prosedur (SOP) dan dilaksanakan oleh 9 orang karyawan. Bangunan gedung MRF di rencanakan menggunakan baja, dengan rincian profil yaitu kuda -kuda menggunakan profil WF 250x175x7x11, untuk kolom utama menggunakan WF 300x300x10x15, untuk kolom sekunder menggunakan WF 200x200x8x12 dan gording menggunakan profil WF 100x50x5x7. Kata kunci: MRF, Reduksi, Sampah, SOP, SAP 2000 ABSTRACT PT.X an industry engaged in the construction of ships with the estimated number of employees in 2020 reached 3792 people. Every day this industry produce B3 and non B3 waste (similar household trash), but at this point PT.X only do the any B3 waste management , whereas non B3 garbage is collected and disposed as a whole to the final processing places (TPA) without any management. In chapter 13 paragraph 3 of UU No. 18 of 2012 about waste management, waste explained that the management of industrial estates in waste sorting is require to provide regional scale waste sorting facility. Therefore, it needs Material Recovery Facility (MRF) as the one of waste management unit to reduce non B3 waste in PT. X The sampling method is based on SNI 19-3964-1995 about retrieval and measurement of sample generation and waste composition. Sampling results show the amount of waste produced at 131.5 kg / day, with a composition of 5.2 kg / day of wet waste can be composted. Dry waste can be sold for 126.3 kg / day and a residue of 9.0 kg / day. These results indicate that the Temporary Disposal Land should be developed as a MRF and MRF building. PT.X requires an area of 155 m2 with the completeness of the physical components that include a dry waste sorting, sorting goods storage warehouse, enumeration place, composted place, sieving land, compost containers, residue shelters, office, staff basecamp and cart parking area. MRF PT.X operational processes will be regulated according to Standard Operating Procedures (SOP) and implemented by nine employees. MRF building planned by using steel with details of the profile that is the kuda-kuda using profile WF 250x175x7x11, for the main column using WF 300x300x10x15, for secondary column using WF 200x200x8x12 and gording using profil WF 100x50x5x7. The determination of this profile assisted by using SAP 2000 software. Key word: MRF, Reduction, Waste, Standar Operational Procedure, SAP 2000

Item Type: Thesis (Diploma)
Subjects: T Technology > T Technology (General)
Divisions: ?? tkdkk ??
Depositing User: Unnamed user with email repository@ppns.ac.id
Date Deposited: 28 Aug 2018 02:37
Last Modified: 28 Aug 2018 02:37
URI: http://repository.ppns.ac.id/id/eprint/169

Actions (login required)

View Item View Item