DESIGN VERTICAL AIR RECEIVER UNTUK PENUNJANG PROSES PRODUKSI

Kurniawan, Ferdi Agus (2017) DESIGN VERTICAL AIR RECEIVER UNTUK PENUNJANG PROSES PRODUKSI. Diploma thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.

Full text not available from this repository.

Abstract

ABSTRAK Dalam sebuah proses produksi di bebarapa perusahaan fabrikasi menggunakan tenaga angin untuk mengoperasikan alat bantu produksi seperti gerinda. Maka dibutuhkan rangkaian komponen untuk menggerakan alat-alat pembantu produksi, komponen tersebut seperti compressor, air receiver , tube dan lain-lain. Dalam penelitian ini lebih menekankan proses desain dari hand calculation hingga estimasi cost dalam proses pembuatan air receiver. Penelitian ini memperhitungkan desain vertical air receiver dengan memvariasikan tekanan dan juga fungsi dari air receiver itu sendiri. Basic calculation dihitung dengan menggunakan hand calculation berdasarkan ASME VIII dan membandingkannya dengan menggunakan metode elemen hingga yaitu software ansys, dan diakhir menentukan biaya dalam proses pembuatan vertical air receiver ini. Hasil dari perhitungan tegangan adalah 73,5 MPa unutk air receiver A , dan 57,4 MPa untuk vertical air receiver B, maka safety factor yang didapatkan adalah 3 untuk air receiver A dan 4 untuk air receiver B. Sedangkan defleksi yang teradi adalah 0,3 mm untuk air receiver A dan 0,2 mm untuk air receiver B, dari segi estimasi cost ± Rp 115.725.700 untuk air receiver A dan ± Rp 107.261.310 untuk air receiver B. Kata Kunci: Air receiver, Ansys Defleksi, Estimasi Biaya, Tegangan. ABSTRACT Production process in several fabrication companies using wind power to operate production aids such as grinding wheels. Therefore it takes a series of components to move the tools of production auxiliaries, components such as compressor, air receiver, tube and others. In this research more focus on design process from hand calculation to cost estimation in air receiver manufacture process. This research takes into calculate the vertical design of the air receiver by varying the pressure and also the function of the air receiver it self. Basic calculation uses the hand calculation method based on ASME VIII and compares it using finite element method through ansys software, and at the end determines the cost in making this vertical air receiver. The result of stress calculation is 75.3 MPa for air receiver A, and 57.4 MPa for vertical air receiver B, then the safety factor obtained is 3 for air receiver A and 4 for air receiver B. While the deflection is 0.3 mm for air receiver A and 0.2 mm for air receiver B, in terms of estimated cost ± Rp 115.725.700 for air receiver A and ± Rp 107.261310 for air receiver B. Keyword: Air receiver, Ansys, Cost Estimation, Deflection, Stress.

Item Type: Thesis (Diploma)
Subjects: T Technology > T Technology (General)
Divisions: Jurusan Teknik Bangunan Kapal > D4 Teknik Pengelasan
Depositing User: Unnamed user with email repository@ppns.ac.id
Date Deposited: 05 Oct 2018 03:05
Last Modified: 05 Oct 2018 03:05
URI: http://repository.ppns.ac.id/id/eprint/1304

Actions (login required)

View Item View Item