OPTIMASI PROSES REPLATING DI PT.INDONESIA MARINA SHIPYARD GRESIK

Riswanda, Anky Riki (2017) OPTIMASI PROSES REPLATING DI PT.INDONESIA MARINA SHIPYARD GRESIK. Diploma thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.

Full text not available from this repository.

Abstract

ABSTRAK Perusahaan yang bergerak di bidang reparasi kapal ini, mengalami masalah dalam aspek perencanaan untuk merencanakan suatu proyek repair pada kapal. Perencanaan yang dilaksanakan tidak dilakukan dengan perhitungan estimasi terlebih dahulu melainkan dengan perkiraan saja. Secara umum perencanaan suatu proyek dilakukan dengan perhitungan estimasi, setelah itu direncanakan sesuai hasil perhitungan yang sudah didapat. Sehingga proyek tersebut akan lebih terarah dan lebih banyak persiapan dalam hal pengerjaan nantinya. Pada tugas akhir ini dilakukan perhitungan optimasi suatu perencanaan proyek repair kapal pada proses replating. Proses perhitungan tersebut dapat diketahui kebutuhan bahan utama serta durasi jadwal yang sesuai setiap kapal docking dengan ukuran kapal yang berbeda. Dengan demikian perencanaannya akan diperoleh hasil kebutuhan pelat, elektroda, dan jadwal (schedule) yang sesuai pada setiap kapal yang docking dengan metode PERT. Hasil dari perhitungan tentang kebutuhan elektoda dan pelat pada 12 data kapal yang didapat yaitu elektroda sebesar 551.84 Kg dan pelat dengan ukuran 1.2m x 2.4m x 10m dengan berat sebesar 16173,897 Kg atau 72 lembar dalam waktu periode 1 tahun. Dengan estimasi biaya yang dibutuhkan sebesar Rp. 221.155.960. Semakin besar luasan replating maka akan membuat jangka waktu docking semakin lama dan semakin tua umur kapal maka akan juga sering naik docking untuk proses repair. Kata kunci : Optimasi, Replating, Network Planning, Regresi Linier, PERT. ABSTRACT The company that engaged in ship repairment has a problem in the planning aspect to plan a ship repairment project. Planning is not accordance with the estimate calculation but with estimates only. Geerally the project planing is establish by calculating the estimation first, then then it will be planned due to the calculation results. So the project will be more focused and more preparation in terms of workmanship later This final project will optimize the calculation of ship repairment project planning on replating process. The calculation process aim to know the needs of the main material as well as the appropriate schedule duration of each ship docking with different ship sizes. So from the planning will turns out the result of plate, electrode, and schedule rerequirement that appropriate on every ship docking with statistic method used is PERT and Network Planning. The calculation result of electode and plate requirement on 12 ship datas known that electrode needs for 551.84 Kg and plate with 1.2m x 2.4m x 10m size and 16173,897 Kg weight or about 72 sheets of a year. With estimated cost of Rp. 221.155.960. The larger replating area will make the docking period longer and the older the life of the ship will also often ride docking for the repair process. Keywords : Optimization, Replating, Network Planning, Regresi Linier, PERT.

Item Type: Thesis (Diploma)
Subjects: T Technology > T Technology (General)
Divisions: Jurusan Teknik Bangunan Kapal > D4 Teknik Pengelasan
Depositing User: Unnamed user with email repository@ppns.ac.id
Date Deposited: 04 Oct 2018 07:27
Last Modified: 04 Oct 2018 07:27
URI: http://repository.ppns.ac.id/id/eprint/1286

Actions (login required)

View Item View Item