Solikhah, Fitria Imatus (2017) OPTIMASI PENJADWALAN MESIN PRODUKSI FLOWSHOP DENGAN METODE CAMPBELL DUDEK AND SMITH (CDS) DAN NAWAZ ENSCORE HAM (NEH) PADA DEPARTEMEN PRODUKSI MASSAL PT. INDOPRIMA GEMILANG ENGINEERING. Diploma thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.
Full text not available from this repository.Abstract
ABSTRAK Abstrak – Persaingan di era globalisasi menyebabkan setiap perusahaan manufaktur harus terus meningkatkatkan kualitas guna memenuhi kepuasan customer. PT. Indoprima Gemilang Engineering (PT. IPGE) sebagai salah satu perusahaan manufaktur yang bergerak di bidang otomotif khususnya komponen kendaraan beroda empat menerapkan sistem produksi make to order dan flowshop memiliki tantangan untuk meningkatkan kemampuan produksi dan pelayanan produksi dengan meningkatkan utilitas mesin dan ketepatan dalam penyelesaian produksi agar sesuai dengan waktu yang ditetapkan memalui metode penjadwalan . Metode Campbell, Dudek, and Smith (CDS) dan Nawaz, Enscore and Ham (NEH) merupakan metode yang diusulkan dalam penelitian ini. Kedua metode ini akan dibandingkan dengan metode existing perusahan untuk mengetahui metode penjadwalan yang terbaik dan optimal dengan mendapatkan nilai waktu proses (makespan) paling minimum. Hasil dari penelitian ini menunjukkan bahwa, kedua metode dapat digunakan oleh perusahaan sebagai alternatif model dalam meminumkan makespan. Penjdawalan dengan metode CDS menghasilkan makespan sebesar 20060.11 menit dan lebih cepat 766.6 menit dari metode existing. Demikian juga dengan metode NEH menghasilkan makespan sebesar 20052.778 menit dan lebih cepat 773.889 menit. Berdasarkan kriteria ini metode yang paling disarankan untuk perusahaan adalah metode Nawaz Enscore Ham (NEH) Kata kunci : Cambell Dudek Smith, Nawaz Enscore Ham, Penjadwalan, Flowshop, Makespan ABSTRACT Abstract – The competition in the era of globalization has pushed manufacturing companies to raise their quality in order to satisfy the customer. PT. Indoprima Gemilang Engineering (PT. IPGE) is one of automotive manufacturing company that manufacture components for four wheeled vehicle. The company is applying “make to order” and “flowshop” system to increase the production capability and serviceability through increasing the machine utility and precision in term of finishing the production process, so the job is finished in time as being set by scheduling method. Campbell, Dudek, and Smith (CDS) and Nawaz, Enscore, and Ham (NEH) method is a proposed method in this research. Both of these method will be compared with the currently applied scheduling method to find out the best and optimum method by acquiring the minimum process time (makespan). The research shows that both of the proposed method can be applied by the company as an alternative model to minimize makespan. CDS scheduling method resulting a makespan of 20060.11 minutes which is 766.6 minutes faster than the currently applied method. While the NEH method resulting a makespan of 20052.778 minutes which is 773.889 minutes faster than the currently applied method. Therefore, based on the research result, the recommended method for the company is Nawaz Enscore Ham (NEH). Key Word : Cambell Dudek Smith, Nawaz Enscore Ham, Scheduling, Flowshop, Makespan
Item Type: | Thesis (Diploma) |
---|---|
Subjects: | T Technology > T Technology (General) |
Divisions: | ?? tddm ?? |
Depositing User: | Unnamed user with email repository@ppns.ac.id |
Date Deposited: | 03 Oct 2018 07:58 |
Last Modified: | 03 Oct 2018 07:58 |
URI: | http://repository.ppns.ac.id/id/eprint/1258 |
Actions (login required)
View Item |