ANALISA PENERAPAN METODE CRASHING PROJECT PADA PROYEK BANGUNAN BARU KAPAL COASTER H366 2000 GT

Nurrin, Khalda Aulya (2017) ANALISA PENERAPAN METODE CRASHING PROJECT PADA PROYEK BANGUNAN BARU KAPAL COASTER H366 2000 GT. Diploma thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.

Full text not available from this repository.

Abstract

ABSTRAK Waktu dan biaya merupakan hal yang sangat berpengaruh terhadap keberhasilan atau kegagalan suatu proyek, terutama proyek bangunan baru kapal dalam suatu galangan. Tolak ukur keberhasilan proyek bangunan baru ini bisa dilihat dari waktu penyelesaian yang singkat dengan biaya minimal namun tetap menjaga mutu dari pekerjaan tersebut. Oleh karena itu usaha untuk mengoptimasikan waktu dan biaya sangat penting dalam perencanaan suatu proyek bangunan baru kapal. Metode yang dipakai untuk mencari biaya dan waktu yang optimal adalah metode crashing project. Pada Tugas Akhir ini saya membahas tentang Berapa durasi (waktu) optimum pelaksanaan proyek bangunan baru kapal Coaster H366, berapa banyak biaya yang dibutuhkan proyek bangunan baru kapal Coaster H366 di akhir peninjauan setelah dilakukan crashing project, serta berapa besar biaya penambahan tenaga kerja yang dibutuhkan. Dari perhitungan yang telah dilakukan, didapat durasi waktu optimum pelaksanaan proyek bangunan baru kapal Coaster H366 selama 573 hari dengan total biaya di akhir peninjauan Rp 62.531.427.214,29. Dengan adanya crashing project ini, maka tenaga kerja pun bertambah sehingga didapat biaya penambahan tenaga kerja sebesar Rp 98.760.000,00. Keywords: biaya, crashing project, waktu, kapal Coaster, Network Planning ABSTRACT Time and cost are very influential on success or failure of project, especially for new ship building project in shipyard. The measurement for success of new ship building project are viewed from the short time of completion with minimal costs while maintaining the quality of the works. Therefore the effort to optimize time and costs are crucial in planning of new ship building project. The method used to find the cost and the optimal time is crashing project. In this thesis, I discuss about how to optimum time of the implementation for new ship building project of Coaster H366, How much costs to build a new ship building project after crashing project, and how much the cost of additional labor required. From the calculations that have been done, obtained the optimum time of implementation new ship building of Coaster H366 is 573 days, with total final costs are Rp 62.531.427.214,29. With this crashing project, the labor was increased so the additional cost of labor is Rp 98.760.000,00. Keywords: Cost, Crashing project, Time, Coaster, Network planing

Item Type: Thesis (Diploma)
Subjects: T Technology > T Technology (General)
Divisions: Jurusan Teknik Bangunan Kapal > D3 Teknik Bangunan Kapal
Depositing User: Unnamed user with email repository@ppns.ac.id
Date Deposited: 22 Sep 2018 02:43
Last Modified: 22 Sep 2018 02:43
URI: http://repository.ppns.ac.id/id/eprint/1174