ANALISA PERBANDINGAN JAM ORANG DAN CONSUMABLE PADA PROSES PRODUKSI di BLOK SS2B PEMBANGUNAN KAPAL CEPAT RUDAL 60 –M PT. PAL INDONESIA (Persero)

Dita, Trilailana (2015) ANALISA PERBANDINGAN JAM ORANG DAN CONSUMABLE PADA PROSES PRODUKSI di BLOK SS2B PEMBANGUNAN KAPAL CEPAT RUDAL 60 –M PT. PAL INDONESIA (Persero). Diploma thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.

Full text not available from this repository.

Abstract

ABSTRAK Jam Orang (JO) merupakan jam kerja yang dibutuhkan untuk menyelesaikan suatu pekerjaan sampai pekerjaan tersebut selesai. Material consumable merupakan komponen yang penting dalam pembangunan kapal pada tahap konstruksi. Perencanaan Jam Orang dan material consumable sangat penting diperhitungkan agar tidak terjadi penambahan dari yang direncanakan sehingga dapat meminimalisasi kerugian terhadap perusahaan. Dari data yang diperoleh dari PT. PAL INDONESIA (persero) perhitungan jam orang dilaksanakan pada tahap fabrikasi, sub assembly, dan assembly saja sedangkan kebutuhan material consumble difokuskan pada tahap assembly adalah membandingkan antara perencanaan dengan pelaksanaan dilapangan. Berdasarkan hasil analisa perencanaan dan pelaksanaan dilapangan didapatkan ketidaksesuaian antara jam orang dengan kebutuhan consumable pada proses pembangunan blok SS2B kapal KCR 60-M tahap fabrikasi, sub assembly, dan assembly kebutuhan jam orang perencanaan adalah 1542 sedangkan pelaksanaan dilapangan adalah 886 sehingga terjadi percepatan 74 %. Dan untuk material consumable yang digunakan proses pembangunan blok SS2B pada tahap Assembly untuk perencanaan adalah sebagai berikut : Batu Gerinda dan wheell Abbrasive 45 pcs, Rod Welding 225 kg, Etrode Welding 8, Argon, Oxygen, Acetylene, dan Oxygen 17 CYL(BTL), sedangkan pelaksanaan dilapangan adalah Batu Gerinda dan wheell Abbrasive 80 pcs, Rod Welding 300 kg, Etrode Welding 10, Argon, Oxygen, Acetylene, dan Oxygen 18 CYL(BTL) maka terjadi penambahan material consumable. Jadi dapat dilihat pada proses pembangunan blok SS2B kapal KCR 60-M untuk jam orang berjalan sesuai dengan perencanaan sedangkan kebutuhan material consumablenya mengalami penambahan dari yang telah direncanakan. Kunci : Blok, Jam Orang, Material Consumable ABSTRACT Working Hours (JO) is the hours of work required to complete a job until the job is completed. Consumable materials are important component in the construction of ships at the construction stage. Planning Working Hours and consumable material very important to be calculated to prevent the addition of planned so as to minimize losses to the company. From the data obtained from PT. PAL INDONESIA (Persero), calculation of Working Hours held on the stage of fabrication, sub-assembly, and the assembly only while the need for consumable material focused on the assembly stage is to compare between planning and implementation in the field. Based on the analysis in the field of planning and implementation of a mismatch between the hours of those obtained with consumable needs in the development process vessel SS2B block KCR 60-M stage of fabrication, sub-assembly, and the assembly need of the hour is 1542 while planning the implementation of the field is 886 resulting in acceleration of 74% , And for the consumable material used in the process of building blocks SS2B Assembly for the planning stage are as follows: Stone Grinding and Abrasive wheel 45 pcs, 225 kg Welding Rod, Welding Etrode 8, Argon, Oxygen, Acetylene and Oxygen 17 CYL (BTL), while the implementation of the field was Grinding Stone and wheel Abrasive reach 80 pcs, 300 kg Welding Rod, Welding Etrode 10, Argon, Oxygen, Acetylene and Oxygen 18 CYL (BTL) then the addition of consumable material. So it can be seen in the development process vessel SS2B block KCR 60-M for Working Hours went according to plan while the need for consumable material has the addition of which has been planned. Keywords: Block, Working Hours, Consumable Materials

Item Type: Thesis (Diploma)
Subjects: T Technology > T Technology (General)
Divisions: Jurusan Teknik Bangunan Kapal > D4 Teknik Perancangan dan Kontruksi Kapal
Depositing User: Unnamed user with email repository@ppns.ac.id
Date Deposited: 27 Aug 2018 02:56
Last Modified: 27 Aug 2018 02:56
URI: http://repository.ppns.ac.id/id/eprint/110