PERENCANAAN KEGIATAN PERAWATAN PADA REACH STACKER MENGGUNAKAN METODE RCM II DAN PEMBUATAN JSA

AJI, KURNIA SETYO (2017) PERENCANAAN KEGIATAN PERAWATAN PADA REACH STACKER MENGGUNAKAN METODE RCM II DAN PEMBUATAN JSA. Diploma thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.

Full text not available from this repository.

Abstract

ABSTRAK Reach stacker mempunyai intensitas pemakaian yang tinggi dan peranan penting di pelabuhan maka kemungkinan terjadinya kerusakan harus dapat dicegah dan diminimalisir. Untuk menentukan kegiatan perawatan yang tepat, maka terlebih dahulu ditentukan kegagalan fungsi dari setiap komponen menggunakan metode FMEA. Untuk mencegah kegagalan fungsi pada komponen reach stacker, ditentukan jenis kegiatan perawatan dari setiap komponen yang mengalami kegagalan fungsi menggunakan metode RCM II. Selanjutnya melakukan perhitungan kuantitatif yang bertujuan untuk menentukan interval perawatan pada masing-masing komponen. Berdasarkan hasil dari penelitian, menunjukan bahwa terdapat 24 bentuk kegagalan yang mempunyai potensi menyebabkan terjadinya kegagalan fungsi pada reach stacker. Hasil penilaian risiko dengan risk priority number yang diberikan dalam RCM II information worksheet menunjukan bahwa komponen kritis yang perlu mendapatkan prioritas utama untuk diperhatikan adalah hose valve dan pump oil, karena memiliki kegagalan yang sangat tinggi dan dapat mengakibatkan proses kegiatan bongkar muat menjadi terhenti. Hasil perhitungan interval perawatan (TM) dengan mempertimbangkan biaya maintenance (CM) dan biaya perbaikan (CR), maka dapat diketahui nilai interval perawatan optimal (TM) yang diperoleh untuk mencegah kegagalan pada komponen reach stacker lebih kecil dari nilai MTTFnya. Instruksi kerja dibuat agar pekerja mengerti dan memahami urutan atau langkah pekerjaan kegiatan perawatan yang dilakukan. Kata kunci : Reach Stacker, Kegiatan Perawatan, RCM II, Interval Perawatan, Instruksi Kerja ABSTRACT Reach stacker has a high usage intensity and an important role in the port then the probability of damage must be prevented and minimized. To determine the proper treatment activities, then it first determined the failure of the function of each component using the FMEA method. To prevent the failure of the function of the components reach stacker, determined the type of activity the care of any component failure function method using RCM II. Further quantitative calculation that aims to determine the treatment interval on each component. Based on the results of the study, indicate that there are 24 form of failure that had led to the failure of the potential function on a reach stacker. The results of the risk assessment with the risk priority number given in the RCM II information worksheet indicates that critical component needs to get top priority for attention is the hose valve and pump oil, because it has a very high failure and can lead to the process of loading and unloading activities be halted. The results of the calculation interval of treatment (TM) taking into account the cost of maintenance (CM) and the cost of repair (CR), then it can be known the value of optimal maintenance interval (TM) obtained to prevent failures in the components reach stacker is smaller than the value of MTTF. Work instructions made so that workers understand and understand the sequence of steps or work activities performed treatments. Key words : Reach Stacker, Activities Maintenance, RCM II, Maintenance Interval, Work Instruction

Item Type: Thesis (Diploma)
Subjects: T Technology > T Technology (General)
Divisions: ?? tkdkk ??
Depositing User: Unnamed user with email repository@ppns.ac.id
Date Deposited: 21 Sep 2018 03:54
Last Modified: 21 Sep 2018 03:54
URI: http://repository.ppns.ac.id/id/eprint/1093

Actions (login required)

View Item View Item